there are 2 projects under my wing that have been sustaining my sanity. but again... one of the project has the potential of driving me insanely nuts. nevertheless both projects are a good example of working with 2 different contractors and projects of vast difference in scale.
finally for the last 3 years we've finally reached the stage of constructing the e-deck. of course the residential units are still no where near its supposedly completed stage. sigh...
but on the other hand, after the long 3 year hiatus. my little house has finally started moving... and moving pretty fast it is. imagine it was suppose to start construction 1 year ago. i must say i am rather proud to see my little baby taking its shape...
below is a photo of the house... preparing the rebars for the swimming pool and the balancing tank. the foreground is the living room. if you notice which i am sure you cant... the contractor had to do a quick improvisation on the rebar and structural changes. had to arm twist the engineer to change the structural design error. i hate it went engineers wants me to compromise on my side as a result of their lack of due diligence and failure to read the architectural drawings in detail. and so i refused to allow the engineer to psyche me in tolerating the stupid cock-up of having a structural column sitting right into my koi pond. he spent 15 minutes on the phone then later in the meeting trying to pacify me and trying to convince me to look at a different angle by accepting a "box-up". i realise both M+E and structural engineers love to use the word "box-up" as a means to solve every error in detail.
the tricky part was that the error was only discovered after the pile cap was completed. so we had to transfer the structure by introducing a tie beam of 500x1000mm to support the column structure sitting on a 125mm cantilevered slab. haha amazing stuff. now i know how capable the structural engineers are... all they need is a little arm twisting stimulation to let them think outside the box. and we all can talk about cost later... i suppose. haha.

apart from the little house on a little island... there is the monstrous condo development. this... structural design is relatively more complicated. literally each floor is supported on a transfer slab due to the stepping terraces. imagine the 6 storey structure is also sitting on a 500mm thick transfer slab. the mother of all the transfered slab in this entire development. haha...

the e-deck finally taking shape... thats the upper e-deck where the BBQ area is located and right below is the function room.

this the handrail design for the typical penthouse. i find it rather too complicated after seeing the mock-up done by the contractor. the design was to resolve the level changes of the steps yet to keep the continuity of the railings. so it was design on the basis that a person can grab and slide their hands along the handrail without any obstruction to its continuity.

a photo of the swimming pool balancing tank...

its true that i do all the fun stuff in the office... haha.